Six residents want Level 2 chargers, and your electrician says 32 A is available for EV charging. Load balancing lets the chargers share that capacity without exceeding it, and the split changes as cars come and go.

This post walks through the arithmetic step by step: what each car gets, how much energy it adds overnight, and what changes when one stall gets priority. The numbers are illustrative. Whether chargers may share a circuit, and what equipment that requires, depends on your local electrical code; your electrician decides. Check every figure with a licensed electrician before you plan around it.

The garage in this example

These are assumptions for the example, not recommendations:

  • Your electrician says 32 A at 208 V is available for EV charging. This is the group limit. 208 V is typical in commercial applications.
  • Each charger, on its own, could draw up to 32 A.
  • All six chargers are in one load-balancing group.

Step 1: without load balancing

If every charger drew its full 32 A at the same time, six chargers would need:

6 × 32 A = 192 A

That is six times the 32 A available. Without load balancing, 32 A is enough for one charger drawing its full 32 A.

Step 2: with load balancing, equal shares

Load balancing lets several chargers share one circuit’s limited capacity without exceeding it. In Connect Business, the group limit is set in amps.

With no priority charger, the group uses the proportional algorithm: the current is split equally between active sessions.

Cars charging at once Amps per car
1 32.0 A
2 16.0 A
3 10.7 A
4 8.0 A
5 6.4 A
6 5.3 A (check this against your chargers’ minimum; see below)

The split is recalculated continuously as vehicles start and stop charging. When a car stops charging, the freed capacity goes to the cars still charging.

Before you count on shares this small, ask your charger maker for the lowest charging current your model supports, and ask your software provider what the group does when an equal share falls below it.

Step 3: is it enough energy overnight?

Amps per car tell you speed. What residents care about is energy by morning. Energy is current × voltage × time:

32 A × 208 V × 8 hours ≈ 53.2 kWh for the whole group

These figures are energy at the wall; charging losses are ignored. To turn energy into distance, this example assumes a car travels about 5 km (3.1 miles) on each kWh. Your residents’ cars may do better or worse.

Charging window Energy for the group Average per car, if 6 share the night Distance per car
8 hours 53.2 kWh 8.9 kWh about 44 km (28 miles)
12 hours 79.9 kWh 13.3 kWh about 67 km (41 miles)

This is the worst night: all six cars sharing the whole window. If only three residents charge on a given night, each gets twice as much. The useful question for your board is not “how many stalls?” but “how much energy does each driver need per night, and does the worst night cover it?”

Step 4: giving one stall priority

Suppose one resident drives for work every morning and needs a reliable charge, or the board agrees one stall should come first. In Connect Business, the administrator chooses the priority charger, and only one charger in a group can have priority. With a priority charger set, the group uses the prioritized algorithm: the priority charger is served first, and the remainder is shared between the others.

Each charger can have its own current limit, so you can decide how much the priority stall takes. In this example, the priority charger is limited to 12 A, and three other cars are charging:

  • Priority car: 12 A
  • The other three share 32 A − 12 A = 20 A: 20 A ÷ 3 = 6.7 A each

Because the priority charger is served first, the others share only what it leaves. Set the priority charger’s own limit on purpose.

When the priority car stops charging, its share is not wasted. If the priority charger does not need its full share, the unused capacity goes to the other chargers. The three cars move to 32 A ÷ 3 = 10.7 A each.

Priority is zero-sum. Every amp guaranteed to one stall comes from the others. Use it for a clear reason your board agrees on, and write the rule down.

Three details worth checking

Phases. Each load-balancing group is single-phase or three-phase, with a maximum group current in amps. On a three-phase group, the limit applies to each phase. Ask your electrician which applies to your installation.

No separate meter. Load balancing needs no separate meter. The group works to the limit you enter, so that number has to be right for your building, and it should come from your electrician.

If a charger loses its link. If a charger loses its link to the platform, what it does depends on the algorithm. By default, it keeps its last current limit. Share this with your electrician when you agree the group limit.

What to do now

  1. Ask a licensed electrician how much current is available for EV charging, and what the group limit should be.
  2. Ask your charger maker for the minimum charging current of the model you plan to buy.
  3. Work out the energy per car on the worst night, using the arithmetic above, and compare it with your residents’ daily driving.
  4. Decide whether any stall needs priority, how many amps it should take, and write the rule down.
  5. Decide who may charge. In Connect Business, driver groups, for example residents, control who may charge.
  6. Plan for growth. A load-balancing group has no fixed maximum number of chargers, but every charger you add shares the same limit, so rerun step 3 each time, and check each share against your chargers’ minimum current.

Planning chargers for a shared garage?

Load balancing does not create capacity. It shares the capacity your electrician confirms, fairly and in real time, so the same 32 A can serve six stalls instead of one. See how load management works in Connect Business, or book a business demo and we will go through your garage with you.