EV charging glossary
Short definitions of the terms that come up when you run EV chargers, each with its source. Terms with more to say have their own page.
EV charging terms, A to Z
BootNotification
The first message a charger sends each time it boots or reboots, with its model and vendor. The management system answers Accepted, Pending or Rejected (OCPP 1.6, §4.2).
Charging profile
A schedule of maximum charging rates per time interval that the management system sends to a charger (OCPP 1.6, §3.13.1). See smart charging.
Charging station management system (CSMS)
The software that manages charging stations and holds the information to authorize users of those stations (OCPP 2.0.1 Part 0, §1.2.1). OCPP 1.6 calls it the Central System.
Charging station, EVSE and connector
In OCPP 2.0.1, a charging station is the physical system where an EV can be charged. It has one or more EVSEs, and each EVSE can deliver energy to one EV at a time. A connector is one independently operated electrical outlet on the station; an EVSE can have several, for different vehicle types (OCPP 2.0.1 Part 0, §1.2.1; Part 1, terms).
DataTransfer
The OCPP message for vendor-specific data or functions that OCPP does not cover (OCPP 1.6, §4.3).
Heartbeat
A message a charger sends after a set interval with no other OCPP traffic, so the management system knows it is still alive. The answer carries the server's current time (OCPP 1.6, §4.6, §9.1.10). Any message counts as a sign of life, so a charger may skip a heartbeat when it has sent another message within the interval (OCPP 1.6, §4.6).
Idle fee
A fee for leaving a car plugged in after the charging session is complete, usually after a grace period. New York State's charging program for its own employees, for example, charges idle vehicles per hour after a 30-minute grace period (NY Office of General Services).
idTag (IdToken)
The identifier a driver presents to start charging, such as the number of an RFID card. In OCPP 1.6 it is a case-insensitive string of up to 20 characters (OCPP 1.6, §7.28).
Load balancing
Sharing one electrical limit, in amps, between several chargers.
More about Load balancingLocal Authorization List and Authorization Cache
The Local Authorization List is a list of identifiers and their status that the management system sends to a charger, so the charger can authorize drivers without asking the server, for example while offline (OCPP 1.6, §3.5.2).
The Authorization Cache is the charger's own record of identifiers it has seen. The two are separate, and for the same identifier the local list takes priority (OCPP 1.6, §3.5.1, §3.5.3).
OCPP
The open protocol between a charger and its management software.
More about OCPPPlug & Charge (ISO 15118)
Charging that starts when the car is plugged in, with no card or app.
More about Plug & Charge (ISO 15118)Smart charging
Charging profiles that set when and how fast cars may charge.
More about Smart chargingStatusNotification
The message a charger sends when a connector's status changes, or to report an error (OCPP 1.6, §4.9). The statuses are explained in our connector status guide.
V2G, V2H and V2X (bidirectional charging)
Bidirectional charging lets energy flow back out of the car's battery. The Open Charge Alliance describes V2X as bidirectional energy flows that let EVs act as energy sources (Open Charge Alliance, 2025). The US Department of Energy uses V2X as the umbrella term for vehicle-to-grid (V2G), vehicle-to-home (V2H) and vehicle-to-load technologies (US DOE, 2022).
ISO 15118-20, published in April 2022, specifies the communication between the car and the charger, with application-layer messages for power transfer between them (IEC webstore). OCPP 2.1, released in January 2025, adds support for ISO 15118-20 with bidirectional power transfer (Open Charge Alliance, 2025). What a building needs for it is in our article on Plug & Charge and V2G for property owners.
vendorErrorCode
An optional field of StatusNotification for the manufacturer's own error code, up to 50 characters (OCPP 1.6, §6.47). For the general error code OtherError, the specification points to vendorErrorCode for more information (OCPP 1.6, §7.6).
Sources
- Open Charge Alliance (2017). Open Charge Point Protocol 1.6, edition 2 (opens in a new tab). §3.5, §3.13.1, §4.2, §4.3, §4.6, §4.9, §6.47, §7.6 ChargePointErrorCode, §7.28, §9.1.10; accessed 2026-10-21.
- Open Charge Alliance (2025). OCPP 2.0.1 Edition 4, Part 0 – Introduction and Part 1 – Architecture & Topology (opens in a new tab). Part 0 §1.2.1 Terms; Part 1 terms (Connector, EVSE); accessed 2026-10-21.
- IEC webstore (2022). ISO 15118-20:2022 (opens in a new tab). abstract; publication date 2022-04-26; accessed 2026-10-22.
- Open Charge Alliance (2025). OCPP 2.1 is now available (opens in a new tab). published 23 January 2025; V2X and ISO 15118-20 bidirectional power transfer; accessed 2026-10-22.
- U.S. Department of Energy (2022). Department of Energy Announces Additional Signatories to Vehicle-to-Everything Memorandum of Understanding (opens in a new tab). published 2022-12-01; V2X as V2G, vehicle to home and vehicle to load; accessed 2026-10-22.
- New York State Office of General Services (2026). Employee Zero-Emission Vehicle Charging Program (opens in a new tab). idle fee after the charging session is complete, 30-minute grace period (Level 2); page date not stated; accessed 2026-10-22.