Plug & Charge and bidirectional charging (V2G and V2H) both depend on three things at once: the charger hardware, the vehicle, and, for V2G, your utility. Software can switch them on, but it cannot add them to a charger that was not built for them. If you are buying chargers that will stay on the wall for years, ask about these features at purchase.
Here is what each one is, what it needs in the US and Canada, and what to ask.
What Plug & Charge is
Plug & Charge lets a driver plug in and charge without an app or card at the charger. The car identifies itself to the charger, the session starts, and the bill goes to the driver’s account.
It runs on ISO 15118, the international standard for communication between an electric vehicle and a charger. The identification works through digital certificates. In the Open Charge Alliance’s description, when it is plugged in, “the EV sends a ContractCertificate and eMAID to the Charge Point”, and the charger or its management software checks that certificate before charging starts.
What it needs:
- A charger with ISO 15118 hardware. US rules for public chargers built with federal highway funds, such as NEVI, require chargers that conform to ISO 15118-3 and have hardware “capable of implementing both ISO 15118-2 and ISO 15118-20”, and software that is “capable of Plug and Charge” (23 CFR 680.108). Even if your project uses no federal money, the rule shows that ISO 15118 starts with the hardware.
- A vehicle that supports it. Not every model does, and support can depend on the model year.
- Charger software that manages certificates. OCPP 2.0.1 supports ISO 15118 certificates and Plug & Charge authorization. OCPP 1.6 “does not support ISO 15118 messages”, so 1.6 chargers need a workaround that the OCA describes in the same application note.
- Certificates on both sides. In the OCA’s application note, the charger gets its own ISO 15118 certificate, signed by a certificate authority through its management software, and the car’s contract certificate is checked against the matching root certificate. Ask your software provider how it handles Plug & Charge certificates.
Where it helps a property: guest and visitor charging, workplaces, and any site where drivers struggle with apps and payment. For a private condo garage with known residents, it is a convenience more than a need.
What bidirectional charging is
A normal charger moves energy one way, from the building into the car. A bidirectional charger can also move energy back out of the car’s battery:
- V2H (vehicle-to-home): the car powers the home, for example as backup during an outage.
- V2G (vehicle-to-grid): the car sends energy into the grid, often during peak demand, sometimes for payment from a utility program.
- V2X (vehicle-to-everything): the umbrella term for both, used for example in the name of PG&E’s program.
The communication between car and charger is defined in ISO 15118-20, published in April 2022, which sets the messages “for bidirectional power transfer.” For AC systems, where the inverter is in the car, a CPUC Energy Division presentation lists SAE J3072 as the vehicle standard. On the software side, the OCA released OCPP 2.1 in January 2025 with a standard functional block for bidirectional charging.
What V2G needs in North America
1. A bidirectional charger with the right safety listing. In North America, bidirectional charging equipment has its own UL standard, UL 9741, the “Standard for Bidirectional EV Charging System Equipment”. Grid-support functions are covered by UL 1741 and its supplements SA and SB; the CPUC presentation cited in point 3 names UL 9741 together with UL 1741 SB as one pathway. Ask which supplement the exact model is listed to, and whether your utility accepts it.
2. A vehicle whose maker allows it. The car has to support bidirectional power and the automaker has to permit it for that charger. When PG&E in California expanded its V2X program in August 2026, it added new approved vehicle-and-charger pairings from Nissan, Volvo, Polestar and Kia, alongside Ford, Tesla and GM models already on its eligible list, and noted that “capabilities vary by vehicle and charger combination.”
3. Utility approval to send power to the grid. A charger that exports power is treated like other generation on your site. In California, a CPUC Energy Division presentation (April 2025) says DC bidirectional systems can use the existing Rule 21 interconnection process if they meet all its requirements, while AC systems (where the inverter is in the car) could interconnect only through a pilot. A permanent AC process was expected around late 2026; ask your utility for the current status. In California, a DC charger interconnected as one-way (load only) can switch to bidirectional mode only after the utility grants permission to operate, and only the manufacturer or an approved installer may enable it. Rules differ by state, province and utility, so ask your utility before you buy. This is not legal advice.
4. A program, if you want to be paid. Exporting power earns money only where a utility or state program pays for it. PG&E’s program offers incentives to residential and commercial customers, with enrollment open through 30 June 2027. In Massachusetts, the MassCEC V2X Demonstration gave selected residents, school districts and municipal projects free bidirectional chargers; its applications are closed.
What this means for condo boards and property managers
V2H is mostly a single-family home feature today: one car, one charger, one home panel. V2G in a shared garage is harder, because each export needs an approved car-and-charger pair and utility approval at the building. For most condo and multifamily garages, it is a feature to be ready for rather than one to run in 2027.
Plug & Charge is closer. If your chargers serve visitors or the public, ISO 15118 support lets compatible cars start without an app or card at the charger.
At The smarter E Europe in June, bidirectional charging and ISO 15118-20 were on stands across the show; we wrote about it in what we saw in Munich.
What to ask when you buy chargers
- Does the exact model have ISO 15118 hardware, including ISO 15118-20? Can Plug & Charge be enabled by firmware, or is new hardware needed?
- Is it a bidirectional charger, and does it carry a UL 9741 listing (and UL 1741 SB for grid support)?
- Which vehicles has the charger maker approved for bidirectional charging with this model?
- Is it a DC or AC bidirectional system, and what does your utility require to interconnect it?
- Which OCPP version does it run? Plug & Charge needs certificate handling, which OCPP 2.0.1 supports.
- Does your software support Plug & Charge and bidirectional charging, and can it follow grid signals from your utility?
Where Kinethra fits
Kinethra supports OCPP 1.6 and 2.0.1, and OCPP 2.1 support is in development. Kinethra supports Plug & Charge (ISO 15118) and bidirectional charging (V2G and V2H) with compatible chargers and vehicles. Kinethra also supports smart charging based on grid signals.
If you are choosing chargers for a building or a network and want to keep these options open, book a business demo, and we will go through your site and your vehicles with you.
Sources
- IEC, ISO 15118-20:2022, 26 Apr 2022 (opens in a new tab) ()
- Open Charge Alliance, ISO 15118 with OCPP 1.6, 16 Sep 2020 (opens in a new tab) ()
- Open Charge Alliance, 23 Jan 2025 (opens in a new tab) ()
- eCFR, 23 CFR 680.108 (opens in a new tab) ()
- UL Solutions, 11 Oct 2023 (opens in a new tab) ()
- CPUC Energy Division, VGI Forum, 16 Apr 2025 (opens in a new tab) ()
- PG&E Corporation, press release, 24 Aug 2026 (opens in a new tab) ()
- MassCEC, V2X Demonstration (opens in a new tab) ()