OverVoltage: what it means and what to do

"Voltage has risen above an acceptable level" (OCPP 1.6, §7.6). Treat it as a safety signal.

Safety first

This fault involves the charger's electrical protection.

Stop charging and don't touch the charger, its cable or the vehicle connector. If it is safe to do so, switch the charger off at its circuit breaker. Only the charger manufacturer or a licensed electrician should inspect or repair it.

Remote commands restart software. They cannot repair hardware or make an installation safe, so never automate a reset loop.

What it means

OverVoltage is an OCPP 1.6 error code, reported in a StatusNotification (OCPP 1.6, §4.9, §7.6).

The supply voltage the charger measured was higher than it accepts.

Likely causes

OCPP reports that the voltage was too high, not why.

The cause can lie in the site's supply or in the charger, so finding it is a job for a licensed electrician or the charger manufacturer. The voltage readings below help them.

First three checks

  • 1.

    Check the Voltage readings per phase, if the charger reports them (OCPP 1.6, §3.16.3, §7.31).

  • 2.

    Look for a time pattern, such as the same hours every day.

  • 3.

    Are other chargers on the same supply reporting it too?

What to do

  • Safe remote action

    No repeated resets. If it recurs, ChangeAvailability to Inoperative; mid-session, the change is Scheduled for afterwards (OCPP 1.6, §5.2).

  • Dispatch when

    Any repeat, or voltage readings that differ between phases. Send an electrician first.

  • Do not

    Do not repeat resets.

What to tell the customer

"Your charger stopped to protect itself and your car because the supply voltage was too high.

We're arranging for an electrician to check your installation."

A detection rule to start from

On any OverVoltage: raise priority to high and block automatic resets.

On a repeat event: set the connector Inoperative and send an electrician.

Sources

  1. Open Charge Alliance (2017). Open Charge Point Protocol 1.6, edition 2 (opens in a new tab). §3.16.3 Multiple Locations/Phases, §4.9 Status Notification, §5.2 Change Availability, §7.6 ChargePointErrorCode, §7.31 Measurand.

Talk to us about your chargers

What happens next

  1. Tell us about your network.
  2. Meet a Kinethra specialist.
  3. Get your chargers live on Kinethra.
  • 40,000+ chargers onlineOn the Kinethra platform.
  • OCPP 1.6 and 2.0.1Kinethra works with OCPP chargers from any manufacturer.
  • No commission on charging revenueKinethra takes none.
  1. 01Contact
  2. 02Business
  3. 03Request

Step 1 of 3

We use your details to answer your request. See our Privacy Policy for details.