Two rules changed in 2026 for condo charging in Quebec. The new electrical chapter of Quebec’s Construction Code, in force since 26 March 2026, counts EV charging in the load calculation and requires basic charging infrastructure in the parking of new residential buildings with five or more units. A transition period still lets the previous version apply to work that begins before 17 October 2027. Separately, since 1 April 2026 only smart chargers are eligible for Écorecharge assistance.
If your condo is already built, no rule requires you to install chargers today. But if you do install them, only smart charger models on the programme’s list qualify for the grant, and a smart charger comes with software your syndicate will use for years. Here is what the official sources say, as of 22 October 2026.
This article summarizes public sources. It is not legal or technical advice: for your building, talk to a master electrician and, if needed, a lawyer who specializes in condominiums.
What changed in the Construction Code
The new version of Chapter V, Electricity, of Quebec’s Construction Code came into force on 26 March 2026. It adopts the 2021 edition of the Canadian Electrical Code, with Quebec’s own changes. According to the 12 March 2026 release from the Régie du bâtiment du Québec (RBQ) (in French), three changes affect charging:
- some basic charging-infrastructure requirements for individual dwellings with parking, in buildings of 4 units or fewer, are carried over;
- new requirements cover basic Level 2 charging infrastructure for every parking space in residential buildings of 5 units or more;
- charger load must be included in the calculation that sets the capacity of the service and feeders.
A transition period to 17 October 2027
A six-month transition period was originally set to end on 26 September 2026. It has been extended. According to the RBQ, the provisions in force before 26 March 2026 may still be applied to the construction of an electrical installation, provided the work began before 17 October 2027. The extension regulations have been in force since 10 September 2026.
For new residential buildings with more than four units, the government gives 17 October 2027 as the date when basic electrical infrastructure to supply chargers in parking spaces becomes mandatory, after the extended transition period.
Existing condo or new project: who does this affect?
A new project. The developer and its professionals apply the Code. If your syndicate is taking over a recent building, ask which version of the Code the design used and what was planned for the parking.
An existing condo. According to the government, no legal or regulatory obligation requires chargers in a multiple dwelling at this time. Electrical work is subject to the Construction Code. For work that begins before 17 October 2027, either the previous or the new version may apply; your master electrician will tell you which one they use.
In a condo, the project goes through the board and the assembly of co-owners, and must respect the declaration of co-ownership.
The load calculation and energy management systems
Under the new version, charging counts in the calculation even before any charger is installed. The amending regulation published in the Gazette officielle on 11 March 2026 (in French) adds the expected EV charging loads to the calculation “qu’un appareillage de recharge de véhicules électriques soit installé ou non” (whether or not a charger is installed). The Corporation of Master Electricians of Québec (CMEQ) sums up the change (in French) the same way.
The Code also recognizes energy management systems. Under the same regulation, when such a system controls the chargers, the load counted for charging equals the maximum load the system allows.
The government describes such a system as “hardware and software equipment that optimize energy use and protect a building’s electrical infrastructure.” Its examples: a load controller on a dwelling’s electrical panel, or smart panels that share power among several chargers.
One caution: your master electrician or engineer decides which system, hardware and software, can be counted in the load calculation. Charger-management software, ours included, does not replace that design or that calculation. Ask in writing before you sign.
Écorecharge: only smart chargers qualify
Since 1 April 2026, only smart chargers qualify for Écorecharge financial assistance (the programme’s term for chargers that accept remote commands). The date on the purchase or lease invoice decides. Such a charger “can receive, send, and process remote commands using a mobile app or a web application.”
Other conditions include: Level 2 (208 or 240 volts AC), a model on the eligible list, a new unit, and purchase from a Canadian retailer (in French). The eligible list is published in French only.
Charging projects in multiple dwellings. This stream covers buildings with three or more units and parking in a common area. The condo syndicate applies itself, once the work is complete, and cannot be represented. Three project types:
- charging-solution analysis: 75% of eligible expenses, up to $5,000 per building;
- electrical infrastructure work: 50% of eligible expenses, up to $120,000 per building, for infrastructure that can serve chargers in at least half of the parking spaces;
- charger installation: $600 per charger, or per port. Installation costs and network-management fees are not eligible.
Subsidized chargers must be reserved for residents and their visitors (in French). Buildings with five or more units built after 17 October 2027 will not be eligible for infrastructure grants.
Individual charging station in a multiple dwelling. A resident who owns an EV can receive up to $5,000 for the purchase and installation of a charger in the building’s parking: $600 for the charger, plus 50% of eligible installation costs (in French) if the building was built before the cut-off dates the programme sets.
Mind the order: if the syndicate has already received Écorecharge funding for infrastructure work, a resident who installs a charger later gets only $600.
What the smart-charger rule means for your syndicate
A smart charger depends on software for its whole working life. The syndicate will live with that choice for years. Who holds the admin access? Who decides which residents may charge? How does each user pay their share? And what happens if the software provider changes its terms or stops the service?
The simplest protection is an open protocol. With OCPP, the charger and the software speak a common language, which in principle lets you change software without changing the charger, if both support the same version. Our Connect Business software works with OCPP 1.6 and 2.0.1 chargers from any manufacturer, and its interface is available in English, French and Spanish. For drivers, Connect Go needs no app: they charge from the browser.
Checklist for your board
- Place your building. Existing condo or new project? For a new project, which version of the Code did the design use?
- Ask for a load calculation. Ask your master electrician to include current and future charging, and to tell you whether an energy management system is planned.
- You claim after the work, so check every condition before you buy. Model on the list, smart, new, Level 2, invoice dated 1 April 2026 or later, and the order of applications.
- Ask which OCPP versions the charger supports. Kinethra supports OCPP 1.6 and 2.0.1.
- Plan an exit. Can you change software without replacing the charger? Put it in the contract.
- Settle access and billing. Who may charge, and how does each user pay for the electricity they use?
- Respect the condo’s rules. Check the declaration of co-ownership and the status of the parking spaces (private portion, or common portion with restricted use, in the Civil Code’s terms), read the government’s free guide (in French), and talk to a lawyer if needed.
Planning chargers for your condo?
If your syndicate is preparing a charging project, talk to us. Book a business demo, and we will walk through the software side of your project with you.
Sources
- Gouvernement du Québec (RBQ), 12 Mar 2026 (opens in a new tab) ()
- RBQ, 26 Mar 2026 (opens in a new tab) ()
- RBQ, 26 Aug 2026 (opens in a new tab) ()
- Gazette officielle du Québec, 11 Mar 2026 (opens in a new tab) ()
- CMEQ, 5 May 2026 (opens in a new tab) ()
- Gouvernement du Québec, 8 Jul 2026 (opens in a new tab) ()
- Gouvernement du Québec, multiple-dwelling guide (opens in a new tab) ()
- Écorecharge, 20 Mar 2026 (opens in a new tab) ()
- Écorecharge, 24 Sep 2026 (opens in a new tab) ()
- Écorecharge, 21 May 2026 (opens in a new tab) ()
- Écorecharge, 14 Aug 2026 (opens in a new tab) ()
- Écorecharge, 19 Mar 2026 (opens in a new tab) ()
- Écorecharge, 19 Mar 2026 (opens in a new tab) ()
- Écorecharge, 1 Apr 2026 (opens in a new tab) ()
- Écorecharge, 19 Mar 2026 (opens in a new tab) ()
- Écorecharge, 16 Apr 2026 (opens in a new tab) ()
- Écorecharge, 27 Jul 2026 (opens in a new tab) ()
- LégisQuébec, Civil Code of Québec (opens in a new tab) ()